For Aluminium & glass

Bill every stage of the façade. Get your retention back.

Curtain wall, shopfronts, windows and doors are billed in stages over months, with an advance to recover and retention held back on every claim. Mizarah works out each claim and keeps the retention on the job until you release it.

Start free trial →14 days · No card needed · $49 a month after
01 · PROGRESS CLAIMCLM-0002 · EXAMPLE

The advance and the retention come off every claim, in the right order.

A façade contract usually takes an advance at the start and holds back retention on each claim until handover. Mizarah takes both off the work done, then adds VAT on what is left, so the tax invoice is correct on its face and the VAT return agrees with your ledger.

  • Quote by the square metre, by the panel or by the opening
  • Advance, retention and VAT on every claim, never mixed up
  • Retention tracked per job, with the release invoice ready when it is due
  • The contract can never be billed past 100%
Progress claim
Shopfront & curtain wall · contract AED 480,000.00
CLAIM 2
Work done this claim (40%)192,000.00
Less advance recovered (30%)−57,600.00
Less retention (10%)−19,200.00
Taxable amount115,200.00
VAT 5%5,760.00
Total due (AED)120,960.00

Retention held on this job after the claim: AED 19,200.00. Released with its own tax invoice when the job is handed over.

An example with round figures, worked out the way Mizarah does it: deductions first, then VAT 5%.

02 · ONE JOB, START TO FINISH4 STEPS

How a job runs in Mizarah.

  1. 01Quote

    Price the elevations by area or by panel, in English and Arabic, and send it for approval.

  2. 02Advance

    On approval, raise the advance tax invoice. Its VAT is declared once, when the money lands.

  3. 03Claims

    Claim the work done each month. The advance and retention come off, VAT is added on the rest.

  4. 04Retention

    At handover, release the retention held across the claims with one invoice.

03 · IN EVERY ACCOUNTSAME PRICE FOR EVERY TRADE

Everything a UAE contractor needs, not only the claims.

Progress claims
Advance recovery and retention on every claim, VAT worked out on what is left, and a contract that can never bill past 100%.
Tax invoices in two languages
Quotations, delivery notes and tax invoices in English, Arabic or both, switched when you print.
UAE VAT and corporate tax
The VAT 201 return from your own books, and corporate tax worked out from the same ledger.
Job cost
Supplier bills, materials and crew hours on each job, and its margin while it runs.
Payroll
Monthly payroll and end-of-service gratuity for your people.
Ten staff logins
Owner, accounts, sales and site staff, each seeing only their part. $49 a month.

Also for: Steel & metal works, MEP contractors, Gypsum, ceilings & partitions, Furniture & upholstery, Marble & stone, Signage & exhibition stands, Painting & decoration, and Joinery & fit-out.

START14 DAYS · YOUR OWN CONTRACT

Put one of your façade contracts through it.

Enter a real contract, raise a claim with the advance and retention taken off, and see whether the VAT ties out. No card needed, and nothing you enter is deleted when the trial ends.